Operations Department

Boston N Maine

Enfield Local Part III

Ahhhh, the long awaited Part III of my Enfield Local post.  I want to clarify ahead of time that I understand that I am mixing prototype operating schemes around.  Right now I run all of my trains on train orders, because it’s easier for me to keep track of operations on my small layout using one form.  While this post is titled “Enfield Local”, since I currently lack an attached yard, I am actually running this train as an extra (WJ-01), rather than an appropriate train from the timetable I presented in the last post on this subject.  Bear with me; this is all a work in progress.

So, for this operating session I used the train order shown below (they’re normally hand written, but my writing is often barely legible, so I typed this one for clarity).  Aside from the basic information, we see…

View original post 351 more words

This entry was posted in Uncategorized on by .

About Jonathan Caswell

Mr. Caswell has been composing poetry at least since High School. He has been on WORD PRESS for ten years and contributes to two other blogs beside this one. This blog has a Christian emphasis but all bloggers are welcome. Mr. Caswell chooses to---with permission--re[post material of interest

1 thought on “Operations Department

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.